•  

Bulk carrier Juno having problems in Seaway, again

Aug. 3, 2015 at 05:27 by Mikhail Voytenko in Accidents

Bulk carrier Juno had mechanical problems on Aug 2 at around 1830 LT while Seaway off Longueuil, and had to anchor, reports Great Lakes and Seaway Shipping. Two tugs later towed her down the Seaway, two other vessels were delayed. At 0520 UTC Aug 3 Juno was anchored in Montreal.
Juno ran aground under Thousand Islands Bridge in the St. Lawrence River near Alexandria Bay, N.Y., at around 0100 LT Apr 20 while proceeding to Toronto with cargo of sugar, blocking the passage for two days.

Bulk carrier Juno having problems in Seaway, again

Instant Search

Please enter three more characters.

Vessels See all 0 vessels

  Name   IMO MMSI Callsign Length Location  
No vessels found

Ports 0 found

  Name Vessels moored Country LOCODE Size
No ports found